ClickCease
Effective Silt Fence Installation Equipment
Call: (800)965-4665
Menu Call

EPA Verification

The Scientific Verification arm of the EPA – the Environmental Technology Verification Center – organized a panel of industry specialists and DOT directors, who designed and operated the verification protocol for a comparison of the tommy™ installation method and traditional trenching.

 

Their conclusion was that the tommy™ is 3-5 faster than the standard trench method, while producing “consistent, dependable results.”

 

 Click here for more information on this EPA comparison study.

 

 

New Specifications

 

 




Customer Comments

I absolutely love the tommy™. We’re working less hours and servicing more clients. The tommy™ stays in the ground, and the guys aren’t fighting fabric against the wind all day long, like we were with prefab. And, there’s just minor maintenance over a year. We couldn’t be happier.

Tom Lingvai
Lingvai Excavating
Bryan, OH